Conceptual contemporary business campus with office buildings and landscaped open space
Proposed IT and ITeS business park · commercial workplace planning and office-space evaluation in East Bengaluru

Tata Intellion Park Whitefield

Explore Tata Intellion Park Whitefield, a proposed 25.503-acre IT and ITeS campus at Doddanekundi, with project details, location and master plan.

Project snapshot
Project detail Current information
Project Intellion Park
Location Doddanekundi, K R Puram, Bengaluru East
Recorded land area 25.503 acres
Project company TRIL Bengaluru Real Estate Six Limited
Published
Modified

Published by Intellion Park

Request project details

Artist’s impression

Project overview

Tata Intellion Park Whitefield is the buyer-search identity used by this independent information site for Intellion Park at Doddanekundi. The recorded proposal is a 25.503-acre IT and ITeS business park with retail and food-court components in East Bengaluru. The project company named in the current record is TRIL Bengaluru Real Estate Six Limited.

Whitefield is the more familiar office-market description, while Doddanekundi is the recorded locality. This distinction helps separate the Bengaluru campus from other Intellion Park locations and explains why searches such as Intellion Park Whitefield, Tata Intellion Park Bangalore and Tata IT Park Whitefield can refer to this commercial project.

The available record establishes the project identity, land area, commercial use, project company and locality. It does not establish current office-space availability, rent, sale price, leasing terms, launch date, completion timing or residential inventory. Those details should be requested in dated, project-specific documents.

A commercial review should compare the current campus plan, block-level area statement, office specifications and commercial proposal from the same revision. Occupiers should also confirm chargeable-area definitions, parking allocation, fit-out responsibilities, operating costs, access, handover conditions and payment instructions before evaluating office space in Whitefield.

The project is a commercial campus, so residential search conventions do not provide a useful evaluation framework. Apartment configurations, clubhouse inventories, home-possession dates and residential price-per-square-foot comparisons are not substitutes for office-specific information. A workplace decision depends on the building and floor under consideration, the applicable measurement standard, occupation density, services, access controls, parking, fit-out condition and the commercial structure proposed for that space.

Start by reconciling identity across every document. The project name, project company, block label, drawing revision and commercial proposal should refer to the same development and date range. If a brochure uses the broader Whitefield label while a plan uses Doddanekundi, confirm that both identify this site rather than assuming that every Tata Intellion or Intellion Park result belongs to the Bengaluru campus. This is particularly important because Intellion Park is used for more than one office location.

Next, reconcile areas. Ask whether each figure is carpet area, usable office area, built-up area, chargeable area or another contractual measure. A headline square-foot figure cannot be compared until inclusions such as common areas, service zones, terraces, parking and shared facilities are defined. Record the measurement basis beside every rate or occupancy assumption so that two alternatives are compared on equivalent terms.

Building services should be reviewed as operating requirements rather than generic amenities. Ask for the current specification covering electrical capacity, backup power, cooling approach, fire and life-safety systems, lifts, loading and service access, security, telecom pathways, water management and waste handling. The available project record does not confirm these specifications, so no service should be inferred from a representative image or general Tata Realty portfolio material.

Fit-out responsibility can materially change both cost and programme. Establish whether the proposed space is warm shell, fitted, managed or offered under another delivery condition; identify which party designs, approves, procures and maintains each component; and confirm reinstatement obligations. A dated responsibility matrix should align with the lease or transaction document instead of relying on a marketing summary.

Commercial comparison should separate recurring and one-time amounts. Base rent or consideration, common-area maintenance, parking, utilities, deposits, taxes, fit-out contributions, escalation and restoration obligations should be itemised separately. The complete cash-flow schedule is more useful than a single highlighted office-space rate, particularly when alternative proposals use different area definitions or commencement assumptions.

Programme review should distinguish a planning record from a commitment. Ask for the present construction or readiness position of the exact block, the approvals relevant to occupation, the fit-out access date, rent or charge commencement conditions and the contractual handover milestone. No launch, completion or possession date is asserted on this site because the available project information does not establish one.

Finally, keep a controlled comparison sheet. Record the source, issue date, validity, project identity, block, floor, area basis, specification revision, commercial terms, exclusions and open questions for every option. This prevents an older campus plan, a generic Intellion brochure and a current commercial proposal from being treated as one internally consistent document set when they may describe different revisions or purposes.

Recorded project details

Current source-bounded Intellion Park details
Project detailProject information
Project nameIntellion Park — proposed IT / ITeS business park with retail and food court
Project locationDoddanekundi, K R Puram, Bengaluru East, Bangalore
Recorded site area25.503 acres
Project companyTRIL Bengaluru Real Estate Six Limited
Documented statusProject documentation is available for due diligence

Campus planning study

This 3D study follows the seven-block campus arrangement, principal circulation spine and southern cross-site road shown in the Intellion Park plan. Building appearance, façade design, landscape, materials, height expression and perspective are illustrative.

For due diligence, compare the plan's legal boundary, access, fire movement, building labels, parking, service areas and landscape schedule with the current commercial documents.

Read the Tata Intellion Park Whitefield master plan as a coordination document, not as proof that every illustrated element is built, available or included in a commercial proposal. Confirm the drawing title, revision, approval context and scale before using it for circulation, density or phasing decisions. The block selected for an office requirement should be identified consistently in the plan, area statement, specification and proposal.

Vehicle entry, visitor access, employee movement, service circulation and emergency access should be checked separately. A route that appears connected in an overall campus diagram may operate differently after security zoning, construction phasing or tenant controls are applied. Ask how parking allocation, drop-off, loading, deliveries and accessible movement work for the particular building and operating hours under review.

Open space and landscape shown in the interpretation provide campus context but do not establish a delivered amenity schedule. Verify which areas are common, restricted, phased or associated with a particular block, together with maintenance responsibility and access conditions. The 3D view helps readers understand the seven-block organisation; the current drawing and accountable project documents remain the reference for measurements and commitments.

For workplace planning, use the campus plan together with block-level floor plates and service information. Test employee arrival, visitor screening, inter-building movement, food and retail access, emergency assembly and last-mile transport assumptions. These operational questions are more useful for a commercial project than importing residential master-plan ideas such as unit views or clubhouse proximity.

Intellion Park site-plan interpretation

Artist’s impression

Commercial terms and office availability

Intellion Park Whitefield location

The project record places Intellion Park at Doddanekundi in K R Puram, Bengaluru East, within the wider Whitefield office and technology corridor. Whitefield is the familiar market label; Doddanekundi remains the more precise recorded locality.

Use the map as a geographic reference and verify the current project entrance, access route and travel conditions before a site visit. Commercial evaluation should include peak-hour access, public transport, visitor movement, service access and employee catchment checks rather than relying on generic tech park Whitefield commute claims.

Searches for Tata Intellion Park Whitefield, Tata Intellion Park Bangalore and Intellion Park Bengaluru can use different city or market labels for the same buyer research task. The map on this page is anchored to the recorded Doddanekundi point so that the broad Whitefield description does not replace the more precise locality. Confirm the legal boundary and operating entrance before using the point for routing or commute analysis.

A location review should test several journeys instead of quoting one ideal travel time. Examine employee trips from relevant residential catchments, client and visitor access, airport or railway connections where material, vendor deliveries and emergency routes. Run those checks during realistic peak periods and record the date, mode and entrance used, because road conditions and access arrangements can change.

Public-transport research should identify the actual first- and last-mile link for the current entrance. A nearby metro, bus corridor or railway reference does not by itself establish a practical commute. Check walking conditions, shuttle assumptions, interchange time, service frequency, late-shift availability and the route employees would use after security or campus access controls are applied.

Commercial occupiers should also review the surrounding employee and business ecosystem without turning nearby listings into project claims. Food, healthcare, hospitality, banking and support services may affect workplace suitability, but their availability, quality and operating hours should be checked independently. The project record used here does not provide a verified schedule of nearby destinations or measured travel distances.

Before a site visit, request the current entrance pin, host contact procedure and permitted access time. For a formal comparison, retain a location sheet showing the tested route, journey purpose, travel window and any dependency on tolls, shuttles or private transport. This creates a more reliable Whitefield office-space comparison than repeating broad connectivity phrases.

Frequently asked questions

What is Intellion Park at Doddanekundi?

It is recorded as a proposed IT and ITeS business park with retail and food-court components at Doddanekundi in East Bengaluru.

How large is the recorded project site?

The current project record states 25.503 acres.

Who is the project company?

The project company named in the current record is TRIL Bengaluru Real Estate Six Limited.

Is a residential phase included on this microsite?

No. The project record used for this page does not confirm a separate residential phase, configurations, pricing or registration.

Are current commercial terms available?

No current price, rent, deposit or availability schedule is available on this page. Request dated documents for the exact space being evaluated.

Is the campus plan shown here the actual project plan?

The displayed image is a three-dimensional interpretation derived from the current seven-block site-plan drawing. It follows the documented campus arrangement and circulation, while façades, landscape, materials, height expression and perspective remain illustrative and not to scale.

Contact us

Request Intellion Park project details and current document availability.