Intellion Park Company
The project company named in the current record is TRIL Bengaluru Real Estate Six Limited.
Project company
Brand and project company
Brand and project company
Tata Intellion Park Whitefield is the buyer-search identity used by this independent information site for Intellion Park at Doddanekundi. The recorded proposal is a 25.503-acre IT and ITeS business park with retail and food-court components in East Bengaluru. The project company named in the current record is TRIL Bengaluru Real Estate Six Limited.
Whitefield is the more familiar office-market description, while Doddanekundi is the recorded locality. This distinction helps separate the Bengaluru campus from other Intellion Park locations and explains why searches such as Intellion Park Whitefield, Tata Intellion Park Bangalore and Tata IT Park Whitefield can refer to this commercial project.
The available record establishes the project identity, land area, commercial use, project company and locality. It does not establish current office-space availability, rent, sale price, leasing terms, launch date, completion timing or residential inventory. Those details should be requested in dated, project-specific documents.
A commercial review should compare the current campus plan, block-level area statement, office specifications and commercial proposal from the same revision. Occupiers should also confirm chargeable-area definitions, parking allocation, fit-out responsibilities, operating costs, access, handover conditions and payment instructions before evaluating office space in Whitefield.
The project is a commercial campus, so residential search conventions do not provide a useful evaluation framework. Apartment configurations, clubhouse inventories, home-possession dates and residential price-per-square-foot comparisons are not substitutes for office-specific information. A workplace decision depends on the building and floor under consideration, the applicable measurement standard, occupation density, services, access controls, parking, fit-out condition and the commercial structure proposed for that space.
Start by reconciling identity across every document. The project name, project company, block label, drawing revision and commercial proposal should refer to the same development and date range. If a brochure uses the broader Whitefield label while a plan uses Doddanekundi, confirm that both identify this site rather than assuming that every Tata Intellion or Intellion Park result belongs to the Bengaluru campus. This is particularly important because Intellion Park is used for more than one office location.
Next, reconcile areas. Ask whether each figure is carpet area, usable office area, built-up area, chargeable area or another contractual measure. A headline square-foot figure cannot be compared until inclusions such as common areas, service zones, terraces, parking and shared facilities are defined. Record the measurement basis beside every rate or occupancy assumption so that two alternatives are compared on equivalent terms.
Building services should be reviewed as operating requirements rather than generic amenities. Ask for the current specification covering electrical capacity, backup power, cooling approach, fire and life-safety systems, lifts, loading and service access, security, telecom pathways, water management and waste handling. The available project record does not confirm these specifications, so no service should be inferred from a representative image or general Tata Realty portfolio material.
Fit-out responsibility can materially change both cost and programme. Establish whether the proposed space is warm shell, fitted, managed or offered under another delivery condition; identify which party designs, approves, procures and maintains each component; and confirm reinstatement obligations. A dated responsibility matrix should align with the lease or transaction document instead of relying on a marketing summary.
Commercial comparison should separate recurring and one-time amounts. Base rent or consideration, common-area maintenance, parking, utilities, deposits, taxes, fit-out contributions, escalation and restoration obligations should be itemised separately. The complete cash-flow schedule is more useful than a single highlighted office-space rate, particularly when alternative proposals use different area definitions or commencement assumptions.
Programme review should distinguish a planning record from a commitment. Ask for the present construction or readiness position of the exact block, the approvals relevant to occupation, the fit-out access date, rent or charge commencement conditions and the contractual handover milestone. No launch, completion or possession date is asserted on this site because the available project information does not establish one.
Finally, keep a controlled comparison sheet. Record the source, issue date, validity, project identity, block, floor, area basis, specification revision, commercial terms, exclusions and open questions for every option. This prevents an older campus plan, a generic Intellion brochure and a current commercial proposal from being treated as one internally consistent document set when they may describe different revisions or purposes.